Commtech
Asia has extensive knowledge in
the field of Independent Commissioning
Management with over 26 years experience
in Europe and 14 years experience
throughout Asia.
We fully understand the requirements
to ensure that the client receives
a fully operational building with
accurate record documentation at
project handover.
This can only be achieved by driving
the commissioning process from
the earliest stages of design through
the installation stage to the final
proving phase and handover to the
client.
Our approach is to carefully plan
the process by reviewing the design
documentation for commissionability,
single points of failure and future
maintenance issues, preparing coordinated
commissioning Programmes, and assisting
contractors to produce detailed
method statements for all stages
of the testing and commissioning
process.
We undertake regular reviews of
the M&E installation to eliminate
commissioning related problems
before they can impact upon the
programme.
During the testing and commissioning
phase our staff play a pro-active
role in assisting/directing the
installing contractors to ensure
activities are performed in accordance
with the approved method statements
and recognised codes of practice.
Upon completion of the commissioning
phase we witness the testing and
commissioning of the individual
items of plant in a stand-alone
and fully interfaced condition
in readiness for the final proving
phase.



